CONSTRUCTION & REMEDIATION The Presidio Trust Project Background The project involved numerous work elements including installing erosion controls at both sites; establishing and maintaining: work zones, staging areas, fencing, stockpile areas, and decontamination facilities; conducting baseline and as-built topographic surveys; clearing and grubbing of surface vegetation and tree removal; potholing, sample collection and analyses to characterize wastes for disposal/recycling; excavation, segregation, and stockpiling; waste loading, transport and disposal; grading and backfilling; and installation of surface drainage and erosion control measures. ERRG segregated recyclable materials where possible during the project including most construction debris (e.g. concrete masonry, soil, metal), some municipal waste (e.g. cans, bottles, paper), as well as vegetative material. Stringent engineering controls and an air surveillance program were employed at both sites to minimize impacts to the surrounding public during project execution. Additional asbestos dust mitigation measures were implemented during excavation activities at Fill Site 5 due to the presence of serpentinite beneath the fill material. Approximately 33,000 tons of lead-contaminated soil and debris was shipped off-site for disposal during the project. ERRG worked closely with the Presidio Trust to meet their scheduled deadlines and maintain the integrity of the surrounding sensitive habitat and protection of native and cultural plant species. |